The 13m³ Grab Dredger Vessel, built in 2010 in Guangdong, is a reliable and efficient solution for river dredging, port
excavation, and waterway maintenance. With a strong hull structure, 43.5-meter overall length, and a 13m³ high-capacity grab, it is designed for heavy sediment removal. Powered by a Weichai CW12V200ZC-3 900 kW crane engine and equipped with two 75 kW generators, the vessel provides stable performance and continuous operation. It is suitable for coastal engineering projects and various dredging applications.